the house is now about 95% complete and will remain so for another week while we enter the new years holiday.
The remaining work is mostly on the exterior and consists of fixing/cleaning a few things here and there, so we are quite happy. The schedule is spot on. construction costs were on target, and best of all we got our completion certificate a few days ago, after inspection on christmas day. All in all a good way to finish the year.
The last large job left on the exterior was the metalworks – a fence around the deck, a gate, and a cover for mechanical equipment in the parking area out front, and a handrail for the washi-covered stair/wall. It took them a day and a half to install it all.
住宅は95%終わりにしました。新年休みが終わってから残っている所は早くに完成します。
休み前の最後にした大きい仕事は、金属のものでした - デッキ/庭フエンス、ゲート、階段室の手すりキャップと駐車所の機械の化粧扉。全部は亜鉛めきのスチール材で作って貰いました。化粧扉以外は全部1日半ぐらいに設置しました。

↑↑ deck fence – all the metal work is hot-dipped galvanised steel. The process can cause the metal to deform slightly under the heat, so we had the fence made from 6mm FB, which held up fairly well even though this is a very minimal piece, structurally.
デッキ/庭のフエンス ー 亜鉛めっきで作りました。スチールに亜鉛めっきを付ける時には熱いですから、フラットバーが曲がる可能性がありますから、今回は6mmの厚さのものを使いました。このミニマル構造の場合でもそれで大丈夫でした。

↑↑ fence from the back side. the connections for the wall were nicely finished, following the angle of the triangles that support the top rail (in case you are wondering, the tape is a reminder to the contractor to clean the waterproofing coating for the deck where it dripped over the side).
後ろからフエンスを見た感じです。壁と付ける金物は三角の支え物と合わせてきれいに作りました。黄色のテープは掃除することを忘れないため付けてあります。


↑↑ the gate – is made from 2 screens of grating, welded to each side of a steel frame – making a nice moire pattern. The latch is designed so it can be accessed from either side.
ゲート : フレームの両サイドにグレーチングで作りました。

↑↑ the last bit of exterior metalworks is sitting in the parking area in the image above, and is designed to hang (and open) like a door to cover the mechanical equipment. The workmen didn’t have time to install it before holidays began…so it will wait a few days still…
設備機械の化粧扉は今駐車所においてありますけど、新年休みが終わってから設置します。
↓↓ workmen did have time, however, to install the railing/cap that ties the wooden stairwall together, finishing the stairway and the room. originally we had thought to use a wooden cap, but decided on steel flatbar instead to make the stair a bit stiffer. we are still wondering if it should be painted or not, as it looks interesting as it is…and echoes the fence railing outside.
階段室の手すり壁のキャップ。